Ascent 3

Ascent 3 provides up to 45,000 sq ft of fully refurbished office accommodation. The building benefits from flexible floor plates and contemporary common areas. It has been designed to accommodate a number of occupiers and to create a vibrant and exciting working environment.

The refurbishment works are on-site and are due to complete in Q2 2018

THE REFURBISHMENT WORKS ARE ON-SITE AND ARE DUE TO COMPLETE IN Q4 2018

Specification includes:

  • New triple height glazed entrance facade
  • Remodelled and enlarged reception with contemporary finishes
  • New and enhanced toilet facilities with male and female showers on each floor
  • New metal tile plank ceiling including LED lighting
  • Minimum of 2.75m floor to finished ceiling and 4.0 kN/m2 + 1.0 kN/m2 floor loadings
  • New M&E throughout designed for multi-tenant solutions including VRV air conditioning to provide 1:8 sq m occupancy
  • Comprehensive external works to enhance the sense of arrival and upgrading of the hard and soft landscaping
  • Parking will be provided at a ratio of approx. 1:200 sq ft and cycle racks and electrical charging points have been installed
  • Farnborough Aerospace Centre amenities include a restaurant/canteen, cafĂ©, convenience store, gym and conference facilities
  • Shuttle bus from FAC to Farnborough train station/town centre (7 minutes)
  • Sustainability is also at the heart of Ascent 3, and a BREEAM rating of Excellent and an EPC rating of B is targeted

45,000

Sq ft

Over

225

Parking spaces

7

Minute shuttle bus from
Farnborough Train Station

40

Minute train
journey to London

45,000

Sq ft

Over

225

Parking spaces

7

Minute shuttle bus from
Farnborough Train Station

40

Minute train
journey to London

FLOORSQ FTSQ M
SECOND FLOOR15,1231,405
FIRST FLOOR14,9831,392
GROUND FLOOR13,5081,255
RECEPTION2,174202
TOTAL45,7884,254

GROUND FLOOR

Office area13,508 sq ft1,255 sq m

FIRST FLOOR

Office area14,983 sq ft1,392 sq m

SECOND FLOOR

Office area15,123 sq ft1,405 sq m